Question 6.
6.1 Damp and Weatherproofing
What measures have been employed for the disposal of storm water resulting from a storm having an average recurrence interval of 20 years (1 in 20 year storm event)?
6.2 Sanitary facilities
What are the sanitary provision requirements for the residential units located on level 07 and the commercial premises located on the ground floor level?
6.3 Room Heights
What are the minimum ceiling height requirements of the kitchen, laundry and bedrooms in the 2 bed sole occupancy unit located on the Ground Floor Level (G02)?
6.4 Lighting and Ventilation
What are the lighting and ventilation requirements for the sanitary facility located in the Double 2B (604) on level 07?
6.5 Sound Transmission and insulation
1. What are the sound transmission requirements of the ceiling located on the seventh floor (Level 07)?
2. What are the thermal insulation requirements of the roof covering level 07?
Students succeed in their courses by connecting and communicating with an expert until they receive help on their questions
Consult our trusted tutors.